SECTION
11207
PARSHALL
FLUMES
PART
1 GENERAL
1.1 SECTION INCLUDES
A.
Parshall
flumes.
1.2 RELATED SECTIONS
A.
Section
03300 - Cast-In-Place Concrete.
B.
Section
11208 - Metering Manholes.
1.3 REFERENCES
A.
ASTM
D 256 - Standard Test Methods for Determining the Pendulum Impact Resistance of
Notched Specimens of Plastics.
B.
ASTM
D 638 - Standard Test Method for Tensile Properties of Plastics.
C.
ASTM
D 790 - Standard Test Methods for Flexural Properties of Unreinforced and
Reinforced Plastics and Electrical Insulating Materials.
D.
ASTM
D 2583 - Test Method for Indentation Hardness of Rigid Plastics by Means of a
Barcol Impressor.
1.4 SUBMITTALS
A.
Submit
under provisions of Section 01300.
B.
Product
Data: Test results of fiberglass
reinforced plastic laminate.
C.
Shop
Drawings: Show:
1.
Critical
dimensions, jointing and connections, fasteners and anchors.
2.
Materials
of construction.
3.
Sizes,
spacing, and locations of structural members,connections, attachments,
openings, fasteners, and loads.
D.
Manufacturer's
installation instructions.
1.5 DELIVERY, STORAGE, AND HANDLING
A.
Store
products indoors and protect from construction traffic and damage.
PART
2 PRODUCTS
2.1 MANUFACTURER
A.
Provide
products manufactured by Warminster Fiberglass Company; P.O Box 188, Southampton PA 18966-0188; ASD. Tel. (215) 953-1260, Fax. (215) 357-7893.
www.warminsterfiberglass.com
B.
Requests
for substitution will be considered in accordance with provisions of Section
01600.
C.
Substitutions: Not permitted.
2.2 PARSHALL FLUMES
A.
Material: Fiberglass reinforced plastic:
1.
Tensile
strength (ASTM D 638): 14,000 psi.
2.
Flexural
strength (ASTM D 790): 25,000 psi.
3.
Flexural
modulus (ASTM D 790): 1,000,000 psi.
4.
Impact,
notched, Izod (ASTM D 256): 10
ft-lb/in.
5.
Barcol
hardness (resin-rich surface) (ASTM D 2583): 40, minimum, average.
6.
Temperature
limit: 150 degrees F.
7.
Temperature
limit: 200 degrees F.
8.
Chemical
resistance: Comply with ANSI/AWWA F101,
Type II classification.
B.
Construction: One-piece, fiberglass reinforced plastic,
with integral stiffening ribs to make unit self-supporting and eliminate
external bracing.
1.
For
flumes to be embedded in concrete, provide temporary internal bracing.
2.
Make
sizes 8-foot, 10-foot and 12-foot in two pieces for shipping.
3.
Size(s): Indicated on the drawings.
4.
Provide
dual range (nested) flumes where indicated.
5.
Provide
factory assembled inner flume for field nesting in existing flume where
indicated.
6.
Provide
custom height of flume where indicated.
C.
Accessories:
1.
Bushing
for ultrasonic transponder mounting stand.
2.
Integral
stilling well, 8 inches diameter.
3.
Integral
stilling well, 10 inches diameter.
4.
Integral
stilling well, 12 inches diameter.
5.
Integral
stilling well, 14 inches diameter.
6.
Staff
gauge graduated in inches attached to inside wall of flume.
7.
Staff
gauge graduated in feet with 50 divisions per foot; attached to inside wall of
flume.
8.
Staff
gauge graduated in feet, with 1-inch divisions per foot.
9.
Staff
gauge graduated in meters, with 1-millimeter divisions per meter.
10.
Staff
gauge graduated in GPM.
11.
Staff
gauge graduated in MGD.
12.
Inlet
and outlet transition caulking collars, and stub flanges.
13.
Bubbler
tube, molded in.
14.
Drexelbrook
track, molded in.
15.
Special
resin for temperature above 170 degrees F or chemical resistant service.
PART
3 EXECUTION
3.1 EXAMINATION
A.
Verify
that dimensions are correct and project conditions are suitable for
installation. Do not proceed with
installation until unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A.
Install
products in accordance with manufacturer's instructions.
B.
Ensure
that products are installed plumb and true, free of warp or twist, within
tolerances specified by the manufacturer and as indicated in the contract
documents.
C.
Set
flume at proper elevation in accordance with drawings.
D.
Set
floor of flume at inlet end level with flow and across flow. Set side walls
plumb. Set top flanges level, each
side.
E.
Fasten
flume securely to prevent flotation or twisting during placement of concrete.
F.
Place
concrete along sides and bottom of flume to ensure complete filling without
voids and displacement of flume. Stage
placement in alternating lifts, 1/3 height on each side of flume.
3.3 ADJUST AND CLEAN
A.
Clean
surfaces in accordance with manufacturer's instructions.
B.
Remove
trash and debris, and leave the site in a clean condition.
END OF SECTION